Energy demonstration · presenter guide
Show one complete energy journey
Help an underserved household, small business or community service keep its energy assets reliable. This guide does not create records, approve work or certify demo readiness.
Last updated: 14 November 2026
Before you present
Use a dedicated authorised test workspace with clearly labelled synthetic records. Obtain consent before using real pilot evidence. Keep customer names, bills, credentials and private documents out of the presentation.
Prepare a phone, laptop, stable connection and a backup screen recording. A recording is a fallback demonstration, not proof of live execution.
Open your authorised workspaceA five-minute rehearsal
- Explain the need · 30 seconds. Name the intended community and energy problem. If no pilot has agreed, say “proposed pilot”. Do not present an estate as underserved without evidence.
- Find the asset · 45 seconds. Sign in, select the correct property and open Assets. Retrieve the same solar, inverter, battery or generator asset by its saved ID. Show recorded identity, location and condition.
- Show performance · 60 seconds. Open Facility Intelligence. Show dated energy readings, source, cost, outage and evidence. Distinguish manual entry from a verified sensor integration. Water readings are not electrical energy. Avoid adding overlapping generator and diesel readings for the same output.
- Report and act · 90 seconds. Use the available inspection or Service & complaints workflow to record an observed fault against the same asset. Follow scope, quotation, review, approval and Work orders. A fault report never authorises expenditure. Electrical interventions require competent personnel.
- Verify and retrieve · 45 seconds. Reopen the work record, show authorised completion and before/after evidence, then open Reports · Output studio. A draft report or self-reported checklist does not prove independently verified repair.
- Explain the benefit · 30 seconds. Show documented downtime, cost and service evidence. If savings are unmeasured, say “not yet measured”. Explain the pilot and next validation step.
Evidence required before calling it ready
- First and returning login tested on phone and desktop; records remain retrievable.
- Same facility and asset ID throughout the journey; cross-role and cross-tenant checks pass.
- Future maintenance date and recurrence survive reopening without duplicates; schedule activated only after approval.
- Reminder tested using actual delivered callback and controlled inbox receipt. Provider acceptance alone is insufficient. Do not enable unattended emails before webhook and scheduler acceptance.
- Meter units, source attribution, reporting period and costs reconciled to evidence. Compare equivalent periods and state tariffs and assumptions before claiming savings.
- Report exports open correctly, with readable mobile/desktop layouts and no private customer data.
- Real pilot consent, community need, baseline and follow-up measures documented; proposed benefits clearly distinguished from measured results.
Readiness: not assessed by this guide. Record each acceptance result as PASS, FAIL, PARTIAL or NOT TESTED with date, version, reviewer and evidence.
Your application checklist
Confirm two to five eligible adult team members, their roles and availability. Prepare a short problem statement, pilot plan, product explanation, pricing assumptions and a concise pitch. Check the organiser’s current requirements directly; this page does not confirm eligibility or submission.
Read the official energy problem statement